WEB LINKS to 
BUILDING COMMISSIONING
RESOURCES

ENERGY STAR Building Upgrade Manual
http://www.energystar.gov/index.cfm?c=business.bus_upgrade_manual
This Manual is a collection of ENERGY STAR tools that includes a section on recommissioning for existing buildings.

Continous Commissioning Guidebook, Federal Energy Management Program
http://www.eere.energy.gov/femp/operations_maintenance/commissioning_guidebook.cfm
This guidebook presents a comprehensive and ongoing process to resolve operating problems, improve comfort, optimize energy use, and identify retrofits for existing commercial and institutional buildings and central plant facilities. Continuous CommissioningSM (CCSM) has produced typical savings of 20% with payback under three years (often 1-2 years) in more than 130 large buildings.
A Practical Guide for Commissioning Existing Buildings
http://eber.ed.ornl.gov/commercialproducts/retrocx.htm
Commissioning principles are being applied to existing buildings more and more often. Commissioning of existing buildings, also known as retrocommissioning, helps to systematically optimize building systems so that they operate efficiently and effectively, often eliminating the need for costly capital improvements.
Building Commissioning Association
http://www.bcxa.org/resources/index.shtm
The BCA provides information and resources to its members and to the public to increase awareness and promote building commissioning.
NCEF - Building Commissioning for Schools
http://www.edfacilities.org/rl/commissioning.cfm
This is the National Clearinghouse for Educational Facilities' resource list of links, books, and journal articles on building commissioning, which is the process of certifying that a new school building meets required specifications.
AEE - Fundamentals of Building Commissioning
https://www.aeecenter.org/store/detail.cfm?id=807&category_id=4
This is a course offered by the Association of Energy Engineers that will examine all aspects of building commissioning, including project scheduling, roles and responsibilities of the project team, new building commissioning, retro and recommissioning of existing buildings, system by system commissioning requirements, TAB and verification procedures, the LEED rating system, building code issues, and commissioning tools and technologies.
Building Toolbox - Building Commissioning
http://www.eere.energy.gov/buildings/info/operate/buildingcommissioning.html
This site is sponsored by the US Department of Energy.  Due to the sophistication of building designs and the complexity of building systems constructed today, commissioning is necessary, but not automatically included as part of the typical design and construction process. Commissioning is critical for ensuring that the design developed through the whole-building design process is successfully constructed and operated.
The Cost-Effectiveness of Commercial Buildings Commissioning
http://eetd.lbl.gov/emills/PUBS/Cx-Costs-Benefits.html
This report was sponsored by the Assistant Secretary for Energy Efficiency and Renewable Energy, Building Technologies Program, U.S. Department of Energy.